I was concerned that I would have to make a wider hole since it was not exactly over the oven however it worked perfect. Also I did not have to do any patchwork since the chimney covered the hole. So I thought we were done until Ray (electrician) said that I need to cover the gap in the ceiling because if a mouse ever made it into the ceiling he would probably fall down into the chimney and that would not smell too good. So we took a piece of wood and cut a half moon then I plastered the rest with joint compound.
I got up last weekend and we had fog, however it was contained only to the bottom of the canyon. I thought it looked cool. Unfortunately by the time I got up it had mostly dissipated.
As an added bonus the last photo is of a Red-Tailed Hawk that hangs around the canyon.
2 comments:
Pictures tell the range food installation was done perfect. It looks cool.
You're going to put back-splash(tile) next?
Say hello to your flying friend when he(she)visits you next time.
Thanks for you comments on the hood. Back splash might go up later, right now I want to start the focus on the office.
I will say hi when they visit again :)
Post a Comment