We passed the inspection and work is progressing nicely. However we asked the contractor about how much longer it will take and he said a couple of more months. It doesn't seem that it would take that much longer, maybe he is over estimating, but I don't know. I guess it will get done when it gets done.
The shower area is really interesting. When we have done showers we use cement backer board and then
Redgard to waterproof everything. They used
aquabar-b and metal lathe for the walls and
hot mop for the shower pan. I am thinking they will still use some kind of other water proofing. Kinda old school but as long as it works I am happy.
Here are the latest pictures.
|
Window in the hallway installed |
|
Bathroom window installed |
|
Pocket door to the bathroom |
|
other side of pocket door |
|
Panoramic from the bedroom entrance |
|
Panoramic from the back side of bedroom |
|
Bathroom with water proofing and lathe |
|
shower control |
|
shower bench, pony wall and niche |
|
Hot mop shower pan |
2 comments:
That's a pretty obnoxious amount of time for that small of an addition. Contractor must be dividing his time between jobs.
Yeah, we are hoping he is really padding the time frame.