The trim is finally installed and it looks really good. The only things left are the thresholds but they will have to wait until we complete the office bathroom. Which by the way today we removed the toilet and most of the floor.
When removing the floor guess what we found........wait for it..........THAT $%&#*@# TAR PAPER AGAIN. But that is OK because we were expecting it. Although it still does not make it any easier to remove.
Anyway here is a small collage of photos of each of the major steps that we had to take.
Enjoy!!!!!!!! We sure didn't :)
Tuesday, June 14, 2011
Saturday, June 11, 2011
Floor Project part 5
Last weekend we sealed the floors with polyurethane. I have to say this was the easiest part of the entire project. We used a high build polyurethane by Minwax that advertises only two coats.They are true to their word, we only needed two coats.
It really is amazing the transformation from the unfinished floor to when the polyurethane is applied. Almost done, now we just have to put the trim and thresholds.
It really is amazing the transformation from the unfinished floor to when the polyurethane is applied. Almost done, now we just have to put the trim and thresholds.
Monday, May 30, 2011
Floors Part 4
Finished the installation of the wood yesterday. Saturday, including final preparation and clean-up, we spent about 6 hours and Sunday took about 11 hours. Needless to say it was a lot of hard work. We were lucky on Sunday and had a friend help out, otherwise it would have taken a few more hours.
The glue is so sticky and hard to clean up that when we finished Sunday I threw away most of my tools. No way did I want to try and clean them again. The glue will stick to anything, imagine creamy melted marshmallows and multiply it by 1000, not to mention, once it drys good luck on getting it off.
Another issue was the 90% of the long planks were warped. So that added another challenging aspect, which ones to use and not use. However we only had so much wood and ended up using many of the warped ones. Of course the milling was not superb so some were not straight, I guess that is why they make wood filler.
Next up is to fill in any gaps with wood filler, sand, then apply polyurethane.
If anyone ever asks you to come over for a "fun" day of installing glue down hard wood floors....RUN LIKE HELL!!!!!!!
The glue is so sticky and hard to clean up that when we finished Sunday I threw away most of my tools. No way did I want to try and clean them again. The glue will stick to anything, imagine creamy melted marshmallows and multiply it by 1000, not to mention, once it drys good luck on getting it off.
Another issue was the 90% of the long planks were warped. So that added another challenging aspect, which ones to use and not use. However we only had so much wood and ended up using many of the warped ones. Of course the milling was not superb so some were not straight, I guess that is why they make wood filler.
Next up is to fill in any gaps with wood filler, sand, then apply polyurethane.
If anyone ever asks you to come over for a "fun" day of installing glue down hard wood floors....RUN LIKE HELL!!!!!!!
Monday, May 23, 2011
Floors part 3
We are getting closer to the end. Since the last post we have cleaned the floors, tested for moisture, and leveled (or attempted) the floors. I say attempted because they were so bad it took three attempts with the leveling compound and a session of grinding down a ridge. It was a LOT of work. If I had a chance to do it again I would have ground down any high points then skim coated the entire floor.
Next weekend we will lay the floor and then the following week we will put the finish. Almost there.
Next weekend we will lay the floor and then the following week we will put the finish. Almost there.
![]() |
| Moisture test. Thankfully nothing. |
![]() |
| One of the many gaps. |
![]() |
| I first used just dots where it needed to be filled. Not the best way. |
![]() |
| Latex primer, before the self level compound. |
![]() |
| First attempt. |
![]() |
| Finally got smart and did it a different way. Looks like a battle plan. |
Sunday, May 8, 2011
Mr. Clean and a buffer
I knew those 20 years in the Marine Corps were not wasted. As I was trying to figure out how to remove the last of the tar I reflected on my many fond memories of Thursday field days (a field day is when you clean your room and outside areas)(the "fond memories" was sarcasm). So I decided to try and use a buffer with degreaser.
What do you know, it worked like a charm. It took about 5 hours to do both rooms but in the end it finally felt like we made progress. I will go over the floor one more time just to make sure it is clean of all tar/oil residue.
We still have the closet in the front bedroom to complete and then it is on to leveling the floor. Once the floor is level we will let the wood acclimate in the rooms for 7 to 10 days. Then we install.
What do you know, it worked like a charm. It took about 5 hours to do both rooms but in the end it finally felt like we made progress. I will go over the floor one more time just to make sure it is clean of all tar/oil residue.
We still have the closet in the front bedroom to complete and then it is on to leveling the floor. Once the floor is level we will let the wood acclimate in the rooms for 7 to 10 days. Then we install.
| Actually the floor is clean it is just stained |
Sunday, May 1, 2011
More %#&*!!%# Tar Paper
Today we mostly finished the office tar removal. It only took 2 solid weekends. Having never removed anything like this before we were unsure of how to approach it. obviously we did not want to use anything toxic or flammable since this was inside the house. So that meant no gasoline or kerosene and living in California it meant there was not much selection on stripping chemicals.
I first tried to use a propane torch that I borrowed from my boss however it did not work well at all. All it did was melt the tar.
We went with a brand called citrus stripper. It is low VOC, not toxic at all, it cost $41 a gallon and I would have needed around 3 or 4 gallons. It also does not work worth a crap. I followed the directions and left it on for around 3 hours. All it did was to smear it into a blackish blob.
A. Then did her research and came up with the idea of using boiling water and vinegar. Damned if it did not work and I only had to leave it on for about 3 minutes before scraping.
After we finished we then moved onto the new room where we decided to go ahead and rip out the existing floor. And underneath the two layers of stuff we found.......more Tar Paper.
To be continued.........
I first tried to use a propane torch that I borrowed from my boss however it did not work well at all. All it did was melt the tar.
We went with a brand called citrus stripper. It is low VOC, not toxic at all, it cost $41 a gallon and I would have needed around 3 or 4 gallons. It also does not work worth a crap. I followed the directions and left it on for around 3 hours. All it did was to smear it into a blackish blob.
A. Then did her research and came up with the idea of using boiling water and vinegar. Damned if it did not work and I only had to leave it on for about 3 minutes before scraping.
After we finished we then moved onto the new room where we decided to go ahead and rip out the existing floor. And underneath the two layers of stuff we found.......more Tar Paper.
To be continued.........
| Safety First |
| After three hours that is all the stripper did |
| some of the removed tar |
| more removed tar with used blades. we had about 7 bags |
| more tar paper in the office :( |
| here we go again |
Monday, April 18, 2011
%@!!@# Tar Paper!!!!
We are now working on the front bedroom and the office flooring. We plan on laying hardwood flooring to match the existing 2" red oak flooring. However finding actually 2" red oak is a challenge. We want to keep it below $3 a sq ft and we are looking at engineered flooring because it will need to be glued down over concrete. We could go up to 1/2" solid wood but would prefer the engineered.
The front bedroom floor does not need too much prep work but the office is a different story.
There were three layers to remove and we had them tested for asbestos which thankfully came back negative. The first layer was traditional vinyl and the second was some type of vinyl but it had a burlap backing. Both of these came up real easy. The bottom layer was TAR PAPER! So what does that mean? A bitch to remove is what that means. I guess back in the day they used it as a moisture barrier.
We are using a scraper to get the majority off and then will use a chemical stripper to hopefully remove the rest of residue from the concrete. This is important so the glue will stick.
Stay tuned!!!!
The front bedroom floor does not need too much prep work but the office is a different story.
There were three layers to remove and we had them tested for asbestos which thankfully came back negative. The first layer was traditional vinyl and the second was some type of vinyl but it had a burlap backing. Both of these came up real easy. The bottom layer was TAR PAPER! So what does that mean? A bitch to remove is what that means. I guess back in the day they used it as a moisture barrier.
We are using a scraper to get the majority off and then will use a chemical stripper to hopefully remove the rest of residue from the concrete. This is important so the glue will stick.
Stay tuned!!!!
Subscribe to: